Context and purpose.
The Total Logistic project is a completed industrial and administrative facility located in Ilinden, Skopje.
The project was delivered for Total Logistic.
EACOM, operating at the time under the EUROVIA name, delivered the contracted construction works for the facility.
The completed project combines industrial-use accommodation with supporting administrative functions.
The project was completed in 2022.
For EACOM, the facility represents a completed reference in industrial-building construction and logistics-related infrastructure.
Construction delivery of an industrial and administrative facility.
Industrial and administrative facility construction.
The project combines industrial-use space with supporting administrative functions within a single facility.
Projects of this type require coordination between the principal industrial building areas, office accommodation, building-envelope works, technical interfaces and external access arrangements.
EACOM’s public role relates to construction delivery within the contracted scope.
Industrial and logistics-related construction.
Industrial and logistics-related facilities require disciplined coordination of structure, building envelope, internal-use areas, technical interfaces and external access.
The Total Logistic project demonstrates EACOM’s experience in delivering a facility combining industrial and administrative functions.
The completed project strengthens EACOM’s portfolio in industrial buildings and logistics-related construction.
Coordination of structure, envelope, internal interfaces and external works.
Industrial-building projects require coordinated sequencing of structural works, building-envelope activities, internal construction interfaces and external completion works.
EACOM coordinated personnel, machinery, materials and subcontractor interfaces within the contracted construction programme.
Execution was coordinated with the client, appointed supervision and relevant project stakeholders.
Final construction activities were prepared for inspection and handover.
Completed industrial and administrative facility.
The completed project delivered an industrial and administrative facility for Total Logistic in Ilinden, Skopje.
EACOM delivered the contracted construction works under its former EUROVIA legal name.
The project was completed in 2022.
Quality, environment and safety during construction.
Construction activities were managed through coordinated quality, environmental and occupational health and safety procedures.
EACOM currently operates under ISO 9001, ISO 14001 and ISO 45001.
The project required controlled management of active construction zones, machinery movement, material deliveries, workforce activities, structural and architectural interfaces, building-envelope works, finishing activities and completion inspections.
Client, contractor and role separation.
Total Logistic is identified as the project client and investor.
EACOM, operating at the time under the EUROVIA name, delivered the contracted construction works.
EACOM’s construction role must remain separate from ownership, operation and logistics activities carried out by the client.


Other projects in this sector.

LEAR Production Hall Expansion

International Fresh Food Processing Facility