Control built into every stage of delivery.
EACOM integrates health and safety, environmental management and quality assurance into project planning, site execution, inspections, documentation and handover.
Certified management systems provide the framework. Project teams apply the controls in the field.
Internationally recognized systems supporting project delivery.
EACOM operates certified management systems covering quality, environmental management and occupational health and safety across its construction activities.
- Reg. No.
- 44 100 26 32 0093
- Valid From
- 23 June 2026
- Valid Until
- 22 June 2029
- Organization
- EAKOM DOOEL Tetovo
- Language
- EN — English
- Reg. No.
- 44 104 26 32 0093
- Valid From
- 23 June 2026
- Valid Until
- 22 June 2029
- Organization
- EAKOM DOOEL Tetovo
- Language
- EN — English
- Reg. No.
- 44 126 26 32 0093
- Valid From
- 23 June 2026
- Valid Until
- 22 June 2029
- Organization
- EAKOM DOOEL Tetovo
- Language
- EN — English
Construction of building and civil-engineering infrastructure, road paving and rehabilitation, and hydrotechnical works.
Four principles guiding project control.
Risks and requirements addressed before work begins.
Clear ownership assigned at every level of delivery.
Inspections, testing and documented checks confirm compliance.
Findings are converted into corrective and preventive action.
Controls applied through planning, execution and verification.
EACOM applies project-specific controls across health and safety, environmental management and quality assurance.

Health & Safety
Site planning, inductions, toolbox talks, PPE controls and inspections are coordinated around project-specific risks and work activities.
Safer workfronts supported by documented site controls.
Testing may be performed internally or through qualified external laboratories according to project requirements and available certified capability.
A defined process from issue identification to documented closure.
Non-conformities are controlled through assigned responsibility, corrective action, verification and documented closeout.
Issue Identified
A deviation, defect or non-compliance is recorded.
Work Controlled
Affected work is controlled, isolated or suspended where necessary.
Responsibility Assigned
The responsible party and required action are formally identified.
Corrective Action Defined
The agreed correction and preventive measures are documented.
Reinspection Performed
The completed action is inspected or retested.
Closure Documented
Evidence and final acceptance are recorded.
Issue Identified
A deviation, defect or non-compliance is recorded.
Work Controlled
Affected work is controlled, isolated or suspended where necessary.
Responsibility Assigned
The responsible party and required action are formally identified.
Corrective Action Defined
The agreed correction and preventive measures are documented.
Reinspection Performed
The completed action is inspected or retested.
Closure Documented
Evidence and final acceptance are recorded.
Structured records supporting formal project acceptance.
Project controls are documented through planned inspections, approvals, test records and formal handover documentation.
Plan
Inspection and Test Plans define required checks, hold points and acceptance criteria.
Verify
Inspection Requests and approvals confirm work readiness and completed activities.
Record
Test results, certificates, measurements and quality records provide traceable evidence.
Close
As-built files, final inspections and the handover package support formal project transfer.
As-built documentation · Test certificates · Quality records · Final inspection · Client acceptance
Responsibility reinforced through daily site routines.
Site engagement connects project requirements with the people responsible for execution, inspection and documentation.

Site Induction
Project rules, risks and responsibilities communicated before work begins.
Toolbox Talks
Task-specific risks and controls reviewed with the working team.
HSE & Quality Briefings
Project requirements reinforced during execution.
Inspection Records
Site findings and completed checks supported by documented evidence.
Responsibility extending beyond project compliance.
EACOM's certified management systems operate within EA Group's broader environmental, social and governance framework.
Explore EA Group ESGDiscuss project controls, compliance or delivery requirements.
Contact EACOM regarding HSE requirements, quality documentation, project procedures or tender-related certifications.