Franjo Kluz Mixed-Use Building — Aerodrom, Skopje
EACOM delivered the turnkey construction of the 14,982 m² Franjo Kluz Mixed-Use Building in Aerodrom, Skopje, coordinating geodetic works, earthworks, structural construction, building-envelope systems, technical installations, interior completion and infrastructure works.
The project was delivered under EACOM’s former legal name, EUROVIA DOOEL.
Context and purpose.
The Franjo Kluz Mixed-Use Building is a completed residential and business development located in the Aerodrom municipality of Skopje.
Published project information identifies Marai DOOEL and KLIKO GRADBA Ltd as the investors and developers associated with the project.
EACOM, operating at the time under its former legal name EUROVIA DOOEL, delivered the project through a turnkey construction model.
The completed development has a published area of 14,982 m². The legacy project reference records a published project value of 225,741,285 MKD, while the current EACOM reference records completion in 2020.
EACOM’s delivery covered geodetic planning, earthworks, concrete and reinforcement works, steel-related construction, building-envelope components, windows and doors, insulation, façade and architectural works, electrical installations, heating and cooling systems, water-supply systems, MEP coordination, interior finishing and supporting infrastructure works.
The project represents a substantial EACOM reference in large-scale private-sector mixed-use construction and integrated turnkey delivery.
Construction scope and deliverables.
Delivery methodology.
Turnkey delivery required EACOM to coordinate the principal civil, structural, architectural, envelope and technical work packages within one integrated construction programme.
Execution progressed from geodetic setting-out and earthworks through concrete and reinforcement works, steel-related construction, installation of building-envelope components, façade execution, technical systems, internal completion and infrastructure works.
EACOM coordinated site personnel, subcontractors, suppliers, materials and interfaces between structural works, steel components, wall and roof systems, windows and doors, insulation, electrical installations, heating and cooling, water supply and interior finishing.
Completion activities included quality-control checks, resolution of outstanding works, technical-readiness preparation and coordinated handover to the client.
Institutional construction delivery.
Large mixed-use buildings require residential and business functions to be integrated within a shared structural, envelope and technical framework.
Construction delivery must coordinate different occupancy requirements, shared circulation, utility distribution, building-envelope performance, internal finishing and infrastructure connections across the entire property.
The 14,982 m² scale of the Franjo Kluz project required structured resource planning, procurement control, multidisciplinary sequencing and consistent completion standards across multiple work fronts.
The project strengthens EACOM’s portfolio in large-scale mixed-use construction, technical coordination and complete private-sector building delivery.
Turnkey construction and coordinated delivery.
EACOM delivered the project through a turnkey construction model covering the coordinated execution and completion of the principal construction and technical work packages.
The turnkey role required integrated management of site execution, materials, subcontractors, suppliers, technical interfaces, programme coordination, completion readiness and handover preparation.
The turnkey classification refers to construction delivery and must not be expanded into property development, project financing, architectural authorship, apartment sales or post-completion property management without separate documentary confirmation.
Outcomes and contribution.
The completed project delivered 14,982 m² of residential and business building area in Aerodrom, Skopje.
The turnkey construction package integrated geodetic works, earthworks, structural construction, building-envelope systems, technical installations, interior finishing and infrastructure works within a completed mixed-use development.
For EACOM, Franjo Kluz represents a major reference in multidisciplinary turnkey construction and large-scale private-sector urban building delivery.
Residential and commercial building use.
The completed development combines residential accommodation and business premises within a single large urban property in Aerodrom, Skopje.
Residential and commercial functions are supported through shared circulation, technical systems, building-envelope components and common infrastructure.
Property ownership, unit sales, leasing and post-completion management remain separate from EACOM’s construction responsibilities.