Kiro Gavrilovski Residential Building – Skopje is a completed residential building project located on Kiro Gavrilovski Street in Skopje.
Developed for MARAI DOOEL, the project covers a total area of 4,500 m² and was completed in 2019.
EACOM’s delivery included construction execution, supervision, supporting materials, waterproofing systems and final preparation for handover. The project required coordinated delivery across residential building works, technical preparation and completion readiness within an urban residential context.
For EACOM, the project represents a residential building reference demonstrating the company’s capability to deliver private-sector residential projects with construction discipline, quality control and functional completion.
Scope of Works
EACOM’s scope included construction delivery of the residential building, including:
- Structural and building works
- Supporting construction materials
- Execution and supervision
- Waterproofing system
- Façade and exterior works
- Architectural and interior finishing works
- MEP installations
- Electrical installations
- HVAC and ventilation-related works
- Flooring and finishing systems
- Fire safety and accessibility-related elements, where applicable
- Exterior and site works
- Final preparation for use and handover
Technical Relevance
Urban residential buildings require disciplined coordination across structural works, façade systems, waterproofing, technical installations, finishing works and final handover preparation.
For the Kiro Gavrilovski Residential Building, EACOM’s role included construction execution, supervision and waterproofing, supporting the delivery of a functional residential building for private-sector use.
The project demonstrates EACOM’s ability to manage residential construction works with attention to quality, technical coordination and completion readiness.
Execution Approach
EACOM’s execution approach focused on controlled residential building delivery through coordinated construction, supervision and quality control.
The works required alignment between construction materials, structural execution, waterproofing, finishing works, technical installations and final handover preparation.
Project Impact
The completed building contributes to Skopje’s urban residential stock through a private residential development located within an established city area.
As a reference, the project strengthens EACOM’s residential portfolio and demonstrates experience in delivering private residential buildings for investor clients.